The Tesco Express & The Spireworks project entailed the refurbishment of the existing Tesco facility and the construction of three storeys of student accommodation above it, presenting multiple complex engineering challenges. MCL was tasked with full design responsibilities for the Tesco section and developed a performance specification for the student accommodation component.
MEP services included:
Bivalent air-to-water heat pump and gas-fired boiler water heating
VRF air-to-air heat pump space heating systems
Direct electric space heating featuring LOT20 compliant emitters
Balanced supply and extract ventilation systems with heat recovery
Commercial kitchen ventilation systems
Boosted domestic hot and cold water services
Above ground foul drainage
Door access and security
Power, IT, and fire alarm systems
Base and feature lighting including specialist control
Solar photovoltaics
Building Management and Monitoring System (BMMS)